Coverage Handoff Readiness
Abstract
A review protocol for executive offices that want to test handover readiness before coverage begins, not after an external commitment is made.
Methodology
Define the population as every planned coverage period in a fixed cycle, including vacation, leave, and short absences. Record the cycle, the executives, the coverage assistants, and the count. List the required evidence for each handover: brief version, live decision list, owners, access inventory, contact list, do-not-do rules, calendar and travel links, handover conversation date, and debrief notes. Name the authoritative source for each field. The access inventory comes from the system owner; the decision owner comes from the executive or chief of staff; a brief written from memory does not establish either. Sample across coverage lengths and assistant locations. Include a handover with an international time zone, a handover during a board cycle, and a handover that was arranged at short notice. Classify defects as missing decision owner, stale brief, access not tested, missing do-not-do rule, wrong contact, no handover conversation, or no debrief. Assign an owner and a correction date. Report the population, sample, defects, and limits. Retain the brief version and the debrief notes with restricted access. The protocol does not evaluate the performance of the coverage assistant.
Brief completeness
The brief should identify the executive's current priorities, the standing meetings, the live decisions, the decision owners, and the next three days. It should distinguish a decision that can be prepared from one that can be made.
A brief that lists every project but no deadlines is not ready. The review should look for a specific next action and an owner beside each live item.
Access and boundaries
The access inventory should name the systems, the level of access, the owner who can restore it, and the review date. Passwords and one-time codes should not appear in the brief.
The do-not-do rules should cover external meetings, disclosure, travel approval, press, and any executive preference that is not obvious from the calendar. The review should confirm that the coverage assistant can restate them.
Communication and debrief
The handover conversation should happen before coverage and include a short read-back. The daily check-in should record blocked items and changes, and the debrief should capture what failed.
A coverage period without a debrief leaves the next handover to start from the same gaps. The review should compare the brief version with the lessons recorded afterward.
Limitations
The protocol cannot show whether the coverage assistant made a sound judgment in a novel situation. It can show whether the brief, access, and boundaries were present before the situation arose.
Treat the result as a readiness signal for the office, not as a performance rating for an individual.
Key findings
- A coverage brief without live decision owners is a calendar with commentary.
- Access should be tested before the executive leaves, not on the first morning.
- Do-not-do rules need an executive or chief-of-staff source.
- The handover conversation should include a read-back of constraints.
- A debrief is part of the control, not an optional courtesy.
- The review tests readiness, not the quality of the coverage work.
Sources
- Standards for Internal Control in the Federal Government, U.S. Government Accountability Office
- Cybersecurity Framework, National Institute of Standards and Technology
- Privacy Framework, National Institute of Standards and Technology
- Records Management Policy and Guidance, National Archives and Records Administration